Group Project, Part IV (Module 8)

Situation:It is now July 31 and Activities 1.1 through 5.1 are 100% complete as shown on theWBS EV Jul 31 worksheet. Your actual cost equals the budgeted cost except for the additional costs to get back on schedule. You need to calculate the actual cost for WBS 3.4 and 3.7 $____________ actual cost to WBS item 7.3-baseboards, casings, and other details that you changed in Module 4.

Assignment:Update your project schedule with the start/duration changes generated inModule 2 to recover from the storm. Complete the activity “Pool-if ordered” as WBS item 8.3. The pool costs $30,000 and takes 28 days to build. It must be completed in order to start landscaping. Include a screen shot of your revised schedule. Trim the excess and use an appropriate time scale to show the activity durations. Finally, you received the attached letter from Ralph Acme requesting an additional $350. What would you do to resolve this issue?

Update all your earned value calculations, including the revised percent completes through activity 4.8 and the $________ actual cost in WBS item 7.3. Compare the different methods to calculate EAC and TCPI. Explain why the values differ. Which would you give the most credence in forecasting this project?

Also, explain how you need to control costs on this project. Demonstrate your knowledge of the core value of Responsible Stewardship by minimizing the cost.

Please make sure that you cite and reference all your outside sources properly. You must have a minimum of three references, including one peer-reviewed journal article.

Even though you complete this assignment as a group, all students must submit their own paper to their own individual Dropbox. (This Dropbox basket is linked to Turnitin.)

Dot Image
Tutorials for this Question
  1. Tutorial # 00362512 Posted By: rey_writer Posted on: 08/21/2016 04:03 AM
    Puchased By: 4
    Tutorial Preview
    The solution of saint leo prm520 group project4 module 8 latest 2016 july...
    Attachments
    Group_Project,_Part_IV_(Module_8).xlsx (74.61 KB)
    Group_Project,_Part_IV_(Module_8).docx (33.24 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    as...ome Rating Experts are friendly and motivating 04/03/2018
    kici...20123 Rating Experience of personal virtual tutor 03/04/2017

Great! We have found the solution of this question!

Whatsapp Lisa