saint leo prm520 module 2 discussion latest 2016 july
Module 2 Discussion
The Situation: You have been hired as the project manager to construct a custom home. The owners have asked for some “minor changes” such as relocating two electrical outlets, adding a refrigerated wine cabinet that will require an electrical connection, and adding gutters to the outside of the house. The owners have seen the price list for these changes and are agreeable. The owners also requested that an internal wall be relocated. Unfortunately, the wall is load bearing which means that the architect and structural engineer must modify the plans and the local building department must approve the modified plans. The key members in your project team are the architect, structural engineer, and framing subcontractor. The redesign by the architect and engineer will take about two weeks. The building department needs two weeks after you submit the revised plans. You don’t have a price for the relocated wall.
The Assignment: Refer to Section 5.6 of the PMBOK® Guide,5th ed. Prepare a response consisting of a minimum of 500 words. Describe how you would perform control scope and prepare change requests for the Perform Integrated Change Control process. Include at least three credible references in addition to the PMBOK® Guide with at least one of these being a peer-reviewed journal article. Properly cite your response.
-
Rating:
/5
Solution: saint leo prm520 module 2 discussion latest 2016 july