ARCH462 - Building Construction Management And Control

Question # 00836773 Posted By: wildcraft Updated on: 01/06/2023 01:44 AM Due on: 01/06/2023
Subject Architecture Topic General Architecture Tutorials:
Question
Dot Image

Building Construction Management And Control

Fall Semester 2022

Arch 462 – BUILDING CONSTRUCTION MANAGEMENT

And CONTROL

Assignment (2)

(20 Marks)

Casestudy

The National Education Group Ltd (NEGL) is the owner of Jeddah school. NEGL is currently renting a building to use as a primary school in Jeddah. The lease contract will end one year from now, one month after the end of the next school year. NEGL has decided to build a new school at a suitable location close by, they already own the land. This new building must be ready to operate at least one month before the first day of the school year after the next. The school’s summer holiday lasts for 3 months.

Your company, Abni Consultancy Firm (ACF) has decided to bid to offer the project management services required for this project. NEGL has not taken decision yet regarding the Strategic Project Plan (SPP). However, NEGL has declared some information about the project including the 4000 m2 size of the project area, and that the school must include 2 classrooms per year group, supplementary classrooms, drawing and craft studies, computer labs, multipurpose rooms, a main hall, a restaurant, an administration section, an indoor playground, an outdoor play area and car parks. The building must be limited to two floors. The school will accommodate 240 students. Your manager has also told you that for NEGL cost is not a big concern.

ASSIGNMENT SPECIFICATION:

You have been asked by your manager to develop a draft report to cover some components of the SPP:

· Project scope,

· Project delivery method,

· Contract type,

· WBS, and

· Draft schedule.

· Develop a safety plan (extra 250 words – 5 points bonus)

OBJECTIVES:

1. To demonstrate an understanding of Construction Management basics

2. To improve research and evaluation skills.

ASSIGNMENT GUIDELINES:

· Word count is 750 words. (10% flexibility in word count is permitted). If the word counts violate these limits there will be an automatic 10% penalty deducted from the final mark.

· Diagrams and charts are to be used when appropriate.

· The recommended text size is 12 pt and Times New Roman font. And line space should be double.

GRADE EVALUATION

Your overall grade will reflect:

1. The quality of the information in your investigation.

2. The relevance of your information to the given scenario.

3. The detailed nature and comprehensiveness of your assignment.

4. The consistency of information in all sections.

5. The organization of the report.

The total mark for the assignment is 20. (5 points extra for doing Safety plan)

Dot Image
Tutorials for this Question
  1. Tutorial # 00832222 Posted By: wildcraft Posted on: 01/06/2023 01:44 AM
    Puchased By: 2
    Tutorial Preview
    The solution of ARCH462 - Building Construction Management And Control...
    Attachments
    FINCB571_Corporate_Finance_Competency_1_-_Reflection_Competency.ZIP (18.96 KB)

Great! We have found the solution of this question!

Whatsapp Lisa