Attachment # 00011821 - SCM_Project_Paper.docx
SCM_Project_Paper.docx (12.75 KB)
Raw Preview of Attachment:
(refer to the detailed question and attachment below)
You are the Director in charge of developing a contract-pricing model for a complex project – to modernize U.S. Navy Aircraft Carrier shipboard radar systems. Develop a 12-month, high-level pricing plan that proposes 100 employees at these levels and numbers of FTEs: 1 Director, 5 Senior Managers, 20 Senior Developer, and 74 Developers. Use these base (direct cost rates): Director: $100/hour, Senior Manager: $75/hour, Senior Developer: $65/hour, Developer: $50/hour. The overhead rate is 10%, the G&A rate is 15%, and the permitted fee/profit is 10%. With this information, develop the overall costs for the project over the 12 months answering the following questions:1. Show the cost build for each of the above labor categories, and show the overall cost to the client for each of the four categories as well as the total cost of the combined four categories (this combined cost is the cost that would be presented to the federal client). Include in your cost build-out any Indirect costs that you believe are appropriate/related to this proposal.2. List all of your assumptions for the costs built into the response to question 1.Your total response should be no more than the equivalent of 5 typed, double-spaced pages (plus or minus ten percent).
Tutorials for this Question
  1. Tutorial # 00721653 Posted By: neil2103 Posted on: 04/16/2019 12:10 PM
    Puchased By: 3
    Tutorial Preview
    The solution of scm project III...
    Attachments
    Solution-00721653.zip (72 KB)
  2. Tutorial # 00722018 Posted By: neil2103 Posted on: 04/21/2019 09:56 PM
    Puchased By: 3
    Tutorial Preview
    The solution of scm project III...
    Attachments
    Cost_Analysis_Proposal.docx (32.2 KB)
Whatsapp Lisa