The production of a chemical compound requires a curation period of 5.5 hours

The production of a chemical compound requires a curation period of 5.5 hours +/-.5 hours, a speed of 130 rpm +/- 20 rpm to obtain an acceptable product. If we want to know with a 95% confidence level, if these variables affect the production yield, then a multiple linear regression analysis need to be done.
Determine the slope of the line for the Curing time:____________________
Determine the slope of the line for the Rpm: _________________________
Determine the Y intersection:__________________
Determine the Determination Coefficient:_____________________
Based on the R2 value: what conclusion should be taken:
Strong linear relationship with a positive slope |
||
Strong linear relationship |
||
No linear relationship |
||
None of the above |
Determine the Experimental Value of F: _______________
Determine the Critical Value of F: ________________
Based on the ANOVA: what conclusion should be taken:
Strong linear relationship with a positive slope |
||
Strong linear relationship |
||
No linear relationship |
||
None of the above |

-
Rating:
5/
Solution: The production of a chemical compound requires a curation period of 5.5 hours