Attachment # 00002518 - Calculating_Activity-Based_Costing_Overhead_Rates.docx
Calculating_Activity-Based_Costing_Overhead_Rates.docx (12.08 KB)
Raw Preview of Attachment:
(refer to the detailed question and attachment below)
Calculating Activity-Based Costing Overhead RatesAssume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:Setup(1,000setup hours)…………………………………………$146,000Production Scheduling (400batches)…………………………..60,000Production Engineering (60 change orders)…………………90,000Supervision (2,000 direct labor hours)………………………….56,000Machine Maintenance (12,000 machine hours)…………..96,000Total Activity Costs……………………………………………………$460,000The following additional data were provided for Job 845:Direct Materials Costs…………………………………………………………………………………………$8,000Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)……..1000Setup hours………………………………………………………………………………………………………….5 hoursProduction Scheduling……………………………………………………………………………………….. 1 batchMachine hours used (25 Milling machine hours;5 finishing machine hours)……………………………………………………………………………………30 hoursProduction engineering……………………………………………………………………………………3 change ordersRequiredCalculate the cost per unit of activity driver for each activity cost category.Calculate the cost of Job 845 using ABC to assign the overhead costs.Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours calculated in the previous exercise.Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing DepartmentData for 2014 to solve (d)Milling Department manufacturing overhead………………………………………………… $362,000Finishing Department manufacturing overhead………………………………………………..130,000Machine hours usedMilling Department……………………………………………………………………………………10,000 hoursFinishing Department………………………………………………………………………………….2,000 hoursLabor hours usedMilling Department……………………………………………………………………………………….1,000 hoursFinishing Department…………………………………………………………………………………….1,000 hours

Calculating Activity-Based Costing Overhead Rates

Question # 00039490 Posted By: jia_andy Updated on: 12/30/2014 12:43 PM Due on: 04/30/2015
Subject Accounting Topic Accounting Tutorials:
Question
Dot Image

Calculating Activity-Based Costing Overhead Rates

Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:

Setup(1,000setup hours)…………………………………………$146,000

Production Scheduling (400batches)…………………………..60,000

Production Engineering (60 change orders)…………………90,000

Supervision (2,000 direct labor hours)………………………….56,000

Machine Maintenance (12,000 machine hours)…………..96,000

Total Activity Costs……………………………………………………$460,000

The following additional data were provided for Job 845:

Direct Materials Costs…………………………………………………………………………………………$8,000

Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)……..1000

Setup hours………………………………………………………………………………………………………….5 hours

Production Scheduling……………………………………………………………………………………….. 1 batch

Machine hours used (25 Milling machine hours;

5 finishing machine hours)……………………………………………………………………………………30 hours

Production engineering……………………………………………………………………………………3 change orders

Required

a. Calculate the cost per unit of activity driver for each activity cost category.

b. Calculate the cost of Job 845 using ABC to assign the overhead costs.

c. Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours calculated in the previous exercise.

d. Calculate the cost of Job 845 using a machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing Department

Data for 2014 to solve (d)

Milling Department manufacturing overhead………………………………………………… $362,000

Finishing Department manufacturing overhead………………………………………………..130,000

Machine hours used

Milling Department……………………………………………………………………………………10,000 hours

Finishing Department………………………………………………………………………………….2,000 hours

Labor hours used

Milling Department……………………………………………………………………………………….1,000 hours

Finishing Department…………………………………………………………………………………….1,000 hours

Dot Image
Tutorials for this Question
  1. Tutorial # 00038729 Posted By: jia_andy Posted on: 12/30/2014 12:44 PM
    Puchased By: 3
    Tutorial Preview
    The solution of Calculating Activity-Based Costing Overhead Rates...
    Attachments
    Calculating_Activity-Based_Costing_Overhead_Rates_sol.xlsx (11.63 KB)
Whatsapp Lisa