UHV MGMT6355 midterm exam

Question # 00018670 Posted By: neil2103 Updated on: 06/28/2014 07:27 PM Due on: 06/30/2014
Subject General Questions Topic General General Questions Tutorials:
Question
Dot Image

Question 1

A process flowchart uses symbols to represent which of the following?


Factory location


Warehouse space available


Work force schedules


Flows of material or customers


Data analysis

Question 2

An activity-system map is which of the following?


A network guide to route airlines


A listing of activities that make up a project


A diagram that shows how a company's strategy is delivered to customers


A facility layout schematic noting what is done where


A timeline displaying major planned events


Question 3

When deciding to add capacity to a factory which of the following need not be considered?


Maintaining system balance


The frequency of capacity additions


Use of external capacity


Immediate product demand


Availability of raw materials

Question 4

Which of the following is a basic type of process structure?


Process flow diagram


Product matrix


Process matrix


Workcenter


Manual assembly


Question 5

If the actual output of a piece of equipment during an hour is 500 units and it's best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate?


0.75


1.00


1.25


1.33


100

Question 6

In a workcenter, machine A has a ten minute set-up time per batch and a two minute per unit run time. Machine B performs the identical function but has a set-up time of thirty minutes and a one minute run time per unit. The workcenter makes products in batches ranging from one unit to one hundred units. Assuming capacity is not a limitation on either machine, on which batches should machine B be used?


All batches should be run on machine B


Batches of more than 20 units should be run on machine B


Batches of fewer than 80 units should be run on machine B


Batches with up to 50 units should be run on machine B


No batches should be run on machine B

Question 7

If all you knew about a production system was that total daily output was 400 units and the total labor necessary to produce the 400 units was 350 hours, what kind of productivity measure could you use to compute productivity?


Partial measure


Multifactor measure


Total measure


Global measure


All of the above

Question 8

Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons?


Intermediate-range


Long-range


Short-range


Current


Upcoming

Question 9

Which following production process term best describes the situation when activities in a stage of production must stop because there is no work?


Blocking


Buffering


Starving


Buffer


Setup time

Question 10

Which of the following is not considered a major process flow structure?


Work Center


Project


Assembly line


Fabrication


Continuous Flow

Question 11

You are hired as a consultant to decide if your client should purchase a new, highly specialized, piece of equipment. The product to be produced by this equipment is forecast to have a total worldwide demand of 15,000 units over the entire product life. The initial investment to acquire and install the equipment is $256,000. The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?


The company will recover its initial investment


The company's total margin will be less than its investment


It's a good investment


The break-even is lower than the 15,000 units that are expected to sell


All of the above

Question 12

An advantage of a make-to-stock process is which of the following?


Rapid delivery of a standard product


All units of output are unique


It responds directly to customer orders


It allows the firm to avoid inventory costs


It combines the best features of other processes

Question 13

Which of the following is not a benefit of a manufacturing cell layout?


Better human relations


Improved operator expertise


Less in-process inventory and material handling


Faster production setup


Reduced cost

Question 14

A process flowchart uses which of the following symbols to represent storage areas or queues in a flow diagram?


Rectangle


Arrow


Inverted triangle


Diamond


A dashed line

Question 15

Which of the following basic types of production layout formats is one which has similar equipment or functions are grouped together?


Production line layout


Assembly line layout


Workcenter layout


Group technology layout


Manufacturing cell layout

Question 16

A difference between project and continuous flow categories of process flow structures is which of the following?


The size of the product


Discrete parts moving from workstation to workstation


Degree of equipment specialization


Being a "Virtual Factory"


Profit per unit

Question 17

To reduce process throughput time you might try which of the following actions?


Outsource activities


Change the sequence of activities


Improve teamwork


Reduce management interference


Introduce incentive pay

Question 18

Which of the following is a partial measure of productivity?


Output/Materials


Output/(Labor + Capital + Energy)


Output/All resources used


Output/Inputs


All of the above

Question 19

Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?


Cycle time


Flow time


Run time


Setup time


Efficiency

Question 20

Which of the following is not a basic type of process structure?


Product-process matrix


Workcenter


Manufacturing cell


Assembly line


Continuous process

Question 21

According to Little's law, which of the following can be used to estimate inventory?


Process time/Cycle time


Throughput rate times flow time


Process velocity/flow time


Set up time/Throughput rate


Value added time/Process velocity

Question 22

Assume a fixed cost for a process of $15,000. The variable cost to produce each unit of product is $10 and the selling price for the finished product is $25. Which of the following is the number of units that has to be produced and sold to break-even?


500 units


667 units


790 units


900 units


1,000 units

Question 23

Which of the following is a measure of operations and supply management efficiency used by Wall Street?


Dividend payout ratio


Current ratio


Receivable turnover


Earnings per share growth


Financial leverage

Question 24

Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps by which the product is made?


Project


Workcenter


Manufacturing cell


Assembly line


Continuous process

Question 25

Which of the following best describes the term cycle time?


Average time between completions of successive units


Ratio of the time a resource is activated over its use


Can be no more that 60 minutes


The same as utilization


The labor content of the item being measured

Question 26

A process flowchart uses which of the following symbols to represent a decision point in a flow diagram?


Rectangle


Arrow


Inverted triangle


Diamond


A dashed line

Question 27

Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?


3


5


6


8


None of the above

Question 28

The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:


Economies of scale


Economies of size


Economies of shape


Economies of scope


Economies of shipping

Question 29

According to Little's Law, which of the following ratios is used to find flow time?


Cycle time/Process time


Throughput time/Process velocity


Process velocity/Throughput time


Inventory/Throughput rate


Value added time/Process velocity

Question 30

Which of the following basic types of process structures is one which similar equipment or functions are grouped together?


Project


Workcenter


Manufacturing cell


Assembly line


Continuous process

Question 31

To reduce process flow time you might try which of the following actions?


Perform activities in parallel


Change the sequence of activities


Reduce interruptions


Acquire additional equipment


All of the above

Question 32

We would expect to see in a manufacturing cell layout which of the following?


Large teams who collectively do a small part of a finished product


A small team of workers who turn out complete units of work


More in-process inventory


Long production setup times


None of the above

Question 33

You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?


0.500


0.833


0.973


0.990


None of the above

Question 34

A major competitive dimension that forms a company's strategic operational competitive position in their strategic planning is which of the following?


Cost or price


Focus


Automation


Straddling


Activity-system mapping

Question 35

Which of the following is a total measure of productivity?


Output/Materials


Output/(Labor + Capital + Energy)


Output/Labor


Output/Inputs


All of the above

Question 36

When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?


Upgrade the equipment


Assign a roaming helper to support the line


Split the task between two workstations


Speed up the assembly line transfer mechanism


Use a more skilled worker

Question 37

When a company seeks to match the benefits of a successful position while maintaining its existing position in offering customers a variety of differing services, what is this process called?


Operations capability analysis


Straddling


Order qualifying


Order winning


Inter-functional analysis

Question 38

Formulate and use linear programming to solve the following problem. A firm wants to determine how many units of each of two products (products X and Y) they should produce in order to make the most money. The profit from making a unit of product X is $100 and the profit from making a unit of product Y is $80. Although the firm can readily sell any amount of either product, it is limited by its total labor hours and total machine hours available. The total labor hours per week are 800. Product X takes 4 hours of labor per unit and Product Y takes 2 hours of labor per unit. The total machine hours available are 750 per week. Product X takes 1 machine hour per unit and Product Y takes 5 machine hours per unit. Write the constraints and the objective function for this problem, solve for the best mix of product X and Y, and report the maximum value of the objective function. (model formulation 5+solving 8=13 points)

Dot Image
Tutorials for this Question
  1. Tutorial # 00018125 Posted By: neil2103 Posted on: 06/28/2014 07:28 PM
    Puchased By: 3
    Tutorial Preview
    The solution of UHV MGMT6355 midterm exam...
    Attachments
    MGMT6355_midterm_exam.docx (202.27 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    gu...ward Rating Affordable service 06/07/2016

Great! We have found the solution of this question!

Whatsapp Lisa