SAINT MBA550 FINAL EXAM

Question # 00028864 Posted By: sharpbrain Updated on: 10/21/2014 12:23 PM Due on: 12/31/2015
Subject General Questions Topic General General Questions Tutorials:
Question
Dot Image

Question 1. 1. The production manager for the Coory soft drink company is considering the production of two kinds of soft drinks: regular (R) and diet (D). Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of the ingredients), limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the objective function? (Points : 5)

MAX $2R + $4D

MAX $3R + $2D

MAX $3D + $2R

MAX $4D + $2R

Question 2. 2. Project management differs from management of more traditional day-to-day activities because: (Points : 5)

it has limited time frame.

it has an unlimited budget.

it is more expensive.

it involves more of the workforce.

Question 3. 3. The maximum number of constraints that could define the feasible solution space is _____: (Points : 5)

2

3

4

Unlimited

Question 4. 4. A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes., and the range of feasibility is from 130 minutes to 300 minutes, providing two additional machine hours will result in: (Points : 5)

the same product mix, different total profit.

a different product mix, same total profit as before.

the same product mix, same total profit.

a different product mix, different total profit.
Question 5. 5. The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester. "Now we just need to make sure we spend it all," the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision
Variable

Item

Cost

Note

A

iPads for everybody

$750/unit

Must get a cover if these are purchased

B

iPad covers with MBA logo

$25/unit

Not needed unless we buy iPads

C

Speaker series

$15,000

Can't afford both this and the iPads

D

Subscriptions to the Wall Street Journal

$10/unit

Don't need if we have the electronic version

E

Subscriptions to the electronic version of the Wall Street Journal

$5/unit

Worthless without the iPads

Which of the constraints best describes the relationship between the iPads for everyone and the speaker series? (Points: 5)

A - C = 1
A + C = 1

A - C = 0

A + C = 2

Question 6. 6. In a ________ integer model, all decision variables have integer solution values. (Points : 5)

Total

0-1

Mixed

all of the above

Question 7. 7. If a maximization linear programming problem consists of all less-than-or-equal-to constraints with all positive coefficients and the objective function consists of all positive objective function coefficients, then rounding down the linear programming optimal solution values of the decision variables will ________ result in a feasible solution to the integer linear programming problem. (Points : 5)

Always

Sometimes

Optimally

Never

Question 8. 8. When systematically formulating a linear program, the first step is to: (Points : 5)

construct the objective function

formulate the constraints

identify the decision variables.

identify the parameter values.

Question 9. 9. The critical path is the ________ path through the network. (Points : 5)

Longest

Shortest

Straightest

most expensive

Question 10. 10. In a 0-1 integer programming model, if the constraint x1 - x2 = 0, it means when project 2 is selected, project 1 ________ be selected. (Points : 5)

must always

can sometimes

can never
is already

Question 11. 11. Multiple optimum solutions can occur when the objective function is _______ a constraint line. (Points : 5)

unequal to

equal to
linear to

parallel to

Question 12. 12. A shadow price reflects which of the following in a maximization problem? (Points : 5)

The marginal gain in the objective that would be realized by adding one unit of a resource

The marginal gain in the objective that would be realized by subtracting one unit of a resource

The marginal cost of adding additional resources
The marginal gain of selling one more unit

Question 13. 13. In a ________ integer model, some solution values for decision variables are integers and others can be non-integer. (Points : 5)

Total

0-1

Mixed

all of the above

Question 14. 14. For most graphs, the constraint equations which intersect to form a solution point must be solved simultaneously: (Points : 5)

because the solution coordinates from the graph cannot be visually read with high precision.
in order to confirm the mathematically determined coordinates.
in order to determine all of the optimal point solution.
because the slope b and the y-intercept a are not always integers.
Question 15. 15. In order to transform a ">=" constraint into an equality ("=") in a linear programming model: (Points : 5)

add a slack variable.

add a surplus variable.

subtract a surplus variable

subtract a surplus variable and add a slack variable.

Question 16. 16. Cully Turniture buys two products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75,000 to invest in shelves this week, and the warehouse has 18,000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the storage space constraint? (Points : 5)

90 B + 100 M = 18000

90 B + 100 M = 18000

100 B + 90 M = 18000
500 B + 300 M = 18000

Question 17. 17. ________ is used to analyze changes in model parameters. (Points : 5)

Optimal solution

Feasible solution

Sensitivity analysis

A slack variable

Question 18. 18. Which of the following could be a linear programming objective function? (Points : 5)

Z = 1A + 2BC + 3D
Z = 1A + 2B + 3C + 4D

Z = 1A + 2B / C + 3D

Z = 1A + 2B2 + 3D

Question 19. 19. The production manager for the Softy soft drink company is considering the production of two kinds of soft drinks: regular and diet. Two of her resources are production time (8 hours = 480 minutes per day) and syrup (1 of the ingredients) limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the time constraint? (Points : 5)

2R + 4D = 480

2D + 4R = 480

2R + 3D = 480

3R + 2D = 480
Question 20. 20. If t is the expected completion time for a given activity, then _____. (Points : 5)

LF = LS – t

EF = ES – t

EF = ES + t
EF = LS - t

Dot Image
Tutorials for this Question
  1. Tutorial # 00028260 Posted By: sharpbrain Posted on: 10/21/2014 12:24 PM
    Puchased By: 5
    Tutorial Preview
    8. 8. When systematically formulating a linear program, the first step is ...
    Attachments