opm300 module 4 case latest 2017

Question # 00553886 Posted By: rey_writer Updated on: 06/29/2017 12:47 AM Due on: 06/29/2017
Subject General Questions Topic General General Questions Tutorials:
Question
Dot Image

Module 4 - Case

PROCESS SCHEDULING: PERT-CPM

Case Assignment

Part I

Calculate the expected time (hours, days, weeks, or whatever) for the following tasks. Report the time to the next highest whole number.

Task Optimistic (shortest) Time Most Likely Time Pessimistic (longest) Time Expected Time (answer)

A 3 5 7

B 10 15 20

C 4 5 6

D 27 45 90

E 8 9 12

F 81 93 98

Part II

Each of these CPM diagrams corresponds to one of the task lists given below. Match them. Ex. A:#, B:#, etc.

Symbols:

START

END

A.

B.

C.

D.

E.

Part III

Part IV

Estimated and crash costs for each task are shown in the table below.

Answer the questions below the table.

Version 1 Original Estimates Crash Estimates Crash Differentials

Task

(T)

CP

*

Est. Time,

weeks

(ET)

Est. cost,

$1000,

(EC)

Crash

Time,

weeks

(CT)

Crash

Cost,

$1000

(CC)

Time

saved

(ET-CT)

Extra

cost

(CC-EC)

A * 5 10 4 12

B * 7 15 5 17

C 5 8 3 12

D * 6 6 5 8

E * 9 12 8 15

F 4 16 2 20

G * 5 20 2 21

(End) -

CP=Critical Path. If task is on CP, then *; otherwise blank.

Fill in the blank cells under Crash Differentials.

Instead of the scheduled 7 weeks, Task B took 9 weeks. Which task or tasks should be crashed to make up the lost time, at minimum cost? Explain.

Assignment Expectations

There are no page limits. Write what you need to write, neither more nor less. Make each sentence count! (Having said that; it’s unlikely that one page would be enough, and very likely that eight pages would be too much.)

Ensure that your answer reflects your detailed understanding of the theory and techniques taught in this module.

References and citations are required. This requirement can be satisfied by citing the module Home page.

Follow the instructions in the Writing Style Guide.

Dot Image
Tutorials for this Question
  1. Tutorial # 00551270 Posted By: rey_writer Posted on: 06/29/2017 12:47 AM
    Puchased By: 3
    Tutorial Preview
    The solution of opm300 module 4 case latest 2017...
    Attachments
    module_4_case_.doc (234.5 KB)
    module_4_case_.xlsx (10.81 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    j...185 Rating Tutors as per our field of interest 12/25/2017

Great! We have found the solution of this question!

Whatsapp Lisa