Devry BSOP326 week 7 assignment

Question # 00035550 Posted By: spqr Updated on: 12/10/2014 05:38 AM Due on: 12/31/2014
Subject General Questions Topic General General Questions Tutorials:
Question
Dot Image

This case study looks at the behavior of a circuit board process through the use of control charts. At least two control charts will need to be constructed, and from them you will be asked to provide an assessment of what you see. A template to facilitate the construction of the control charts has been provided in Doc Sharing. You are not required to use this template, however, it will greatly facilitate the solution.

Problem Statement

Fujiyama Electronics, Inc. has had difficulties with circuit boards purchased from an outside supplier. Unacceptable variability occurs between two drilled holes that are supposed to be 5 cm apart on the circuit boards. Thirty samples of four boards each were taken from shipments from the supplier as shown in the data from the worksheet below. Data in the worksheet below can also be accessed in Doc Sharing in a file named Fujiyama Electronics Sample Data.

Fujiyama Electronics

Observations
Sample1234
14.924.264.944.29
24.655.5455.42
35.775.264.764.79
46.254.885.664.44
55.275.416.024.91
65.225.385.084.65
75.474.684.564.7
85.714.544.174.87
95.245.584.725.41
104.425.184.794.73
115.144.264.715.48
124.925.785.55.05
135.793.834.34.78
144.924.84.755.59
155.685.744.655.2
165.434.815.274.96
174.796.044.475.18
184.435.083.696.43
196.355.956.295.89
205.034.665.254.46
216.326.095.575.91
224.35.474.274.34
236.074.975.515.02
245.114.95.914.66
254.55.244.864.35
264.914.795.745.03
274.654.714.815.32
284.75.56.044.3
295.875.35.785.07
304.414.754.955.11

Guidelines

Back to Top

The student will submit the completed case study in a Word document to the Dropboxby the end of class Week 7. The paper is worth 50 points.

The student will complete and/or answer the following questions:

  1. Calculate X-Bar-Bar, R-Bar, and associated control limits using the data in the table above.
  2. Create X-Bar•R (Average & Range) Control Charts from the data in the table above.
  3. Discuss notable out-of-control conditions displayed in the completed X-Bar•R (Average & Range) Control Charts. Only consider points outside the control limits. Do not consider runs, set of points within certain zones, and so forth.
  4. If the conditions you note could be defined as assignable conditions, and they are removed from the process, then what will happen to the X-Bar•R Control Chart?
    1. Remove the data related to the out-of-control points you observed from the original data, and recalculate new X-Bar-Bar, R-Bar, and associated control limits.
    2. Create new X-Bar•R (Average & Range) Control Charts from your updated data.
  5. Discuss how the two sets of Control Charts are different. What has changed?

The format of the case study should conform to thePublication Manual for the American Psychological Association(APA), 6th edition, for the title page and text. Citations and references are not required. A basic APA tutorial can be found in the Webliography, and a paper template can be found in Doc Sharing. The completed case study will be submitted to your Dropbox as an MS Word document. All graphics and charts will be a part of the Word document and submitted as a file. Documents authored in other applications such as WordPerfect or MS Works will not be accepted.


Dot Image
Tutorials for this Question
  1. Tutorial # 00034872 Posted By: spqr Posted on: 12/10/2014 05:46 AM
    Puchased By: 4
    Tutorial Preview
    The solution of Devry BSOP326 week 7 assignment...
    Attachments
    Fujiyama_Electronics_Case_Study(1).xlsx (28.09 KB)
    Bsop326.docx (350.52 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    J...is Rating Recommend tutorial service to all 03/24/2020
    ry...09 Rating Provide best and satisfactory work 09/19/2016

Great! We have found the solution of this question!

Whatsapp Lisa