cost analysis
Question # 00047806
Posted By:
Updated on: 02/10/2015 01:18 PM Due on: 02/13/2015

Work Breakdown Structure" Please respond to the following:
- Compare and contrast work breakdown schedule (WBS) and Phase Diagram in terms of appropriateness and effectiveness for the VectorCal navigation system. Determine which method best serves VectorCal’s needs. Provide a rationale for your response.
- Suggest two to three (2-3) other methods that VectorCal could use to obtain labor by OnlineLowDeals" style="border: none !important; display: inline-block !important; text-indent: 0px !important; float: none !important; font-weight: bold !important; height: auto !important; margin: 0px !important; min-height: 0px !important; min-width: 0px !important; padding: 0px !important; text-transform: uppercase !important; text-decoration: underline !important; vertical-align: baseline !important; width: auto !important; background: transparent !important;">cost
data in anaccurate fashion in addition to WBS and Phase Diagram. Predict the manner in which VectorCal could use these methods to decrease the amount of government funds needed.

-
Rating:
5/
Solution: cost analysis