I need assistance in answering one question in Excel using a feature called Crystal Ball I need the response back today ASAP
- You have a network with a critical path A-B-C-D. The values for optimistic (a), pessimistic (b) and most likely (m) durations for each task are as shown below.
Task |
a |
m |
b |
Te |
Var |
A |
6 |
8 |
12 |
|
|
B |
3 |
4 |
6 |
|
|
C |
3 |
9 |
12 |
|
|
D |
5 |
5 |
7 |
|
|
-
- What is the value of μ for the network?
- What is the value of σμ2 for the network?
- What is the probability that this network can be finished within 27 days?

-