BUS375: Project Management Assignment 4: Project Schedule

Question # 00455539 Posted By: kimwood Updated on: 01/04/2017 03:17 AM Due on: 01/04/2017
Subject General Questions Topic College life Tutorials:
Question
Dot Image

Project Schedule



Due Week 6 and worth 150 points

This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule



(Submit as one [1] Microsoft Project file)

  1. In Assignment 2, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.



    Your project must include the following criteria:
    • The project must consist of at least twenty-five (25) tasks.
    • Each task must contain a start date, a finish date, and have main staffing and non-staffing resources assigned.
    • Assume that your work activities are completed during normal weekdays (no weekend work) under normal conditions (8 hours per day).
    • In terms of holidays, you can assume no work will be done the following days: New Year’s Day, President’s Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year’s Eve.

Part B: Written Response



(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

  1. Analyze your project in terms of project completion, critical path, and slack / float. Specifically, be sure to answer the following:
    • When will the project be completed?
    • What is the critical path for the project?
    • How much slack / float is in your project? What activities have the greatest slack / float?
  2. Summarize the recommendations or improvements you would make to your project schedule. Specifically, be sure to answer the following:
    • Identify the top three (3) activities that you believe could impact the project completion date.
    • What additional activities would you add to this project to make it more complete, from a project management viewpoint?
  3. Format your assignment according to the following formatting requirements:
    • Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
    • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page is not included in the required page length.
Dot Image
Tutorials for this Question
  1. Tutorial # 00451409 Posted By: kimwood Posted on: 01/04/2017 03:18 AM
    Puchased By: 4
    Tutorial Preview
    The solution of BUS375: Project Management Assignment 4: Project Schedule...
    Attachments
    pdf_(5).pdf (108.9 KB)
    docx_(47).docx (25.74 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    Coa...ne86 Rating One-on-one chat with the tutors 07/11/2017
    Mo...st49 Rating Amazing tutors 07/06/2017

Great! We have found the solution of this question!

Whatsapp Lisa