Question
Offered Price $50.00

TECH 462 –Industrial Safety Engineering- accident prevention plan

Question # 00047240
Subject: Engineering
Due on: 03/01/2015
Posted On: 02/07/2015 07:14 AM

Rating:
4.1/5
Expert tutors with experiences and qualities
Posted By
Best Tutors for school students, college students
Questions:
44
Tutorials:
47
Feedback Score:

Purchase it
Report this Question as Inappropriate
Question

complete an accident prevention plan for a company

You are to complete an accident prevention plan for a company. The Complete list of content/sections to be covered is listed in the contents section below. The company profile, which you need to match to the content/sections, is listed in the company profile section below. The expected finished length of this assignment is from 75 to 100 pages.

A .docx" href="https://canvas.ewu.edu/courses/943510/files/30083431/download?wrap=1">template has been provided to help you organize your Accident Prevention Plan.

Formatting:

Body Text Size: All of the body text in this assignment needs to be set in 12-point size. Please resist the temptation to mix and match point sizes.

Header Text Size: All of the header text in this assignment can be set in 14-point or 16-point size. Please resist the temptation to mix and match point sizes. Pick your text size and use it consistently throughout the assignment.

Double Spacing: For this assignment select all of your text and set it for double spacing. This includes the headers and body of your work. This allows space for marking up or making notes while I am reviewing what you have written. This also helps to make the document more readable. (The exception to the double spacing is the text on the title page.)

Page Margins: Set your pages to one-inch margins. One-inch margins mean one (1”) on all sides. The only text that ends up on the outside of the one-inch margin is the page number.

Title Page: This page will contain the title, “Accident Prevention Plan”, and the name block. Place the title in the center, right to left and about one-third the way down the page.

Name Block: Place the name block in the center, right to left and about two- thirds the way down the page. Put your name first, then the class title and then the date. Example:

Your Name

TECH 462 –Industrial Safety Engineering

Spelling/Grammar Checking: Remember to do your spelling and grammar checking before turning your assignments in. When doing the spelling/grammar checking keep in mind that some words such as mush and must, woods and words, or here and cow, will not be caught by either check. To correct these problems, you will need to proofread your work.

Page Numbers: Any assignment that has more than one page, needs to have page numbers on it. Please place your page numbers on the bottom of the page. In MS Word, use the footer selection and place the page number in the bottom center orbottom right of the page.

Content:(Major Contents/Sections Check-Off List)

___ 1. Title Page

___ 2. Table of Contents Page

___ 3. Divider Pages

___ 4. Introduction

A. Purpose & Intentions

B. Company Presidents Statement

___ 5. Management Responsibilities

A. Manager Responsibilities

B. Supervisors Responsibilities

___ 6. Employee Orientation

A. How and When

B. Emergency Action Plan

C. Emergency Shutdown Procedures

___ 7. Injury and Illness Procedures

A. Procedures

B. Record Keeping

C. Supervisor Responsibilities

D. Report Form

___ 8. Incident/Accident Investigation Procedures

A. Procedure Steps

B. Worksheet Form

C. Incident/Accident Table

___ 9. Safety Guidelines

A. Guidelines

B. Equipment Specific

C. Individual Specific

___ 10. Safety Disciplinary Policy

___ 11. Safety Awareness Program

A. Safety Committee

B. Safety Meetings

C. Safety Training and Forms

D. Safety Award Program

___ 12. Appendices

A. MSDS

B. State & Federal Posters

C. OSHA Forms and Instructions

Company Profile:

Company Size: 350 employees

Company Product: Custom manufacture of industrial hardened computers (CPU, Keyboards, etc)

Processes at factory include:

Circuit board assembly

Circuit board production

Metal case production

Plastic forming processes

Plastic pellet storage and transport to machines

Shipping/receiving

Specific equipment in factory:

Air compressor

Conveyors

Electric forklift

Hoists

Metal punch presses

Metal bending and cutting machines

Plastic injection molding machines

Plastic sheet forming equipment

Shearing machine for sheet plastic

Safety Promotion Budget: $8,000 annually

Attachments
Tutorials for this Question
Available for
$50.00

TECH 462 –Industrial Safety Engineering- accident prevention plan 79 pages

Tutorial # 00045052
Posted On: 02/07/2015 07:18 AM
Posted By:
Best Tutors for school students, college students Solution
Expert tutors with experiences and qualities
Questions:
44
Tutorials:
47
Feedback Score:
Report this Tutorial as Inappropriate
Tutorial Preview ……
Attachments
accident_prevention_plan.doc (262 KB)
Preview: will xxx them xx accomplishing all xxxxx Each employee xxxxxx look xxxx xx that xxxx attend all xxxxx This will xxxxxx them xxxx x fast xxx a smooth xxxxxxx conditions when xx accident xxxxxx xxx management xxxxxx be in x position of xxxxxxx and xxxxxxxx xxx all xxx employees This xxxxxxxx all the xxxxxxxx personnel, xxxxxxx xxxxxxx checkups, xxxxx aid kits xxxxxxx working environment xxx To xxxx xxxxxxx the xxx accident prevention xxxxxxxx management should xxxx ensure xxxx xxx the xxxxxxxx visiting the xxxxxxx are well xxxxxxx for xxxx xxx necessary xxxxxxxx prevention measures xxxx is because xxxx people xxxxxxxx xxx work xxxxx dont have xxxxxx safety knowledge xxxx people xxxx xxx very xxxxxxxxx and reminding xxxx one in x while xxxxx xx them xxxxxxx Creating a xxxx that can xx looking xxxx xxx safety xxxxxxxxxx all the xxxx is the xxxx option xxxx xxxxx be x team selected xxxxx the the xxxxxxxxx This xx xxx way xx improving the xxxxxxxxxx and thus xxxxxxxx accidents xx xxx times xxxx employees should xx aware of xxx rules xxx xxxxxxxx Regular xxxxxx on new xxxxxxxxxx should be xxxx As xxxx xx a xxxxxxx that deals xxxx import,all instructions xxxxxxx in xxxxxxxxx xxxxxxxxx should xx interpreted to xxxx what it xxx intended xx xx when xx was written x Emergency Action xxxx There xxxxxx xx nothing xxxx can course xx emergency be xxxx to xxxx xxxx When xxx avoidable,they should xxxxx be left xxxxxxxxxx for xx xxx time xxxxxxx when such x situation occurs,it xxxxxx be xxxxxxx xxxx utter xxxx care All xxxxxxx should be xxxxxx how xx xxxxxxx to xxxxxxxxxxx whenever they xxxxx In any xxxx when xx xxxxxxxxx is xxx responded to xx time, they xxx lead xx xxxx consequences xxx thus finally xxxxxxx the whole xxxxxxx In xxxx xx an xxxxxxxxx in the xxxxxxxx working space xxx actions xx xxxxxxxxx below xxxxxx be taken x Emergency Shutdown xxxxxxxxxx Emergency xxxx xxxx procedure xx designed to xxxxxx the losses/consequences xx an xxxxx xx an xxxxxxxx or any xxxxx emergency situation xxxxxx of xx xxxxxxxxx in xxx factory,Follow the xxxxxxxxx procedures Turn xx the xxxxx xxxxxx off xxx power from xxx main switch xxxx off xxx xxxxx machines xxxxxx the factory xxxxxxxxxxx Call the xxxxxxxxx if xxxx xxxxxxx brigade xxxxx first aid xxxxx you can xxxx to xxx xxxxxx site,probably xxxx ground so xxxx the rescue xxxx can xxxx xx Fro xxxx point,more accidents xxx losses will xxxx been xxxxxxxxx xxxxxx Illness xxxxxxxxxx Simple definitions xx injury and xxxxxxx Injury-An xxxxx xxxx results xx physical harm xx the employee xxxxxxxxx deviation xxxx x state xx good health xxxx is a xxxxxxxxx where xxx xxxxxx has xxxxxxx occurred in x factory and xxx are xxxxxxxxx xx how xx go about xx The detailed xxxxxxxxxx below xxxx xxxx how xxxx will be xxxx in an xxxx and xxxx xxxxxxxxxx way x Procedures -The xxxxxxxxxx should take xxxxxx immediately xxxxx xxx emergency xxxxxxxx service service xxx the area xxxxxxxxx service xx xxx factory xxx if the xxxxxx requir.....
Purchase this Tutorial @ $50.00 *
* - Additional Paypal / Transaction Handling Fee (3.9% of Tutorial price + $0.30) applicable
Loading...