A worker is assigned to run number of machines.

Question # 00631827 Posted By: katetutor Updated on: 12/27/2017 12:08 PM Due on: 12/27/2017
Subject Engineering Topic General Engineering Tutorials:
Question
Dot Image
A worker is assigned to run number of machines. The loading time for each machine is 2.00 minutes, unloading is 1.00 minute. Machine runs automatically for 4.00 minutes.

It takes 1.00 minute for the worker to walk between any two machines. 

Machine cost is $14/hr and Operator is working at minimum wage. 

Find the number of machines to be assigned per worker. 

Will there be a change in machine assignment if congress passes a law requiring $2 raise in minimum wage?
Dot Image
Tutorials for this Question
  1. Tutorial # 00630725 Posted By: katetutor Posted on: 12/27/2017 12:09 PM
    Puchased By: 2
    Tutorial Preview
    The solution of A worker is assigned to run number of machines....
    Attachments
    A_worker_is_assigned_to_run_number_of_machines._.ZIP (18.96 KB)

Great! We have found the solution of this question!

Whatsapp Lisa